Estates Reservoir Replacement Project
EBMUD is planning to replace Estates Reservoir, which is located in Oakland on Estates Drive between Bullard Drive and McAndrew Drive. The new reservoir will improve water quality and meet current seismic standards. EBMUD plans to build two small water storage tanks within the footprint of the old Estates Reservoir site and install new landscaping. The existing Montclair Pumping Plant, also located at the site, will be rehabilitated. This work is part of a long-range program to upgrade water distribution facilities in the Central Oakland Hills south of Highway 24 and north of the Oakland/San Leandro border.
Workplan and Schedule
The project construction is expected to start in March, 2012. Construction will take approximately two years.
Contact Information
Michelle Blackwell, Community Affairs Reprsentative II
Email: mblackwe@ebmud.com
Phone: (510) 287-2053
Published Studies and Other Resources
A site map is shown below. Resources available on this project include seismic studies and documents prepared in accordance with the California Environmental Quality Act.
These resources are available below as PDF files that can be viewed and printed with Adobe Acrobat Reader, a free software.
![]()
|
526 KB
| |
|
9967 KB
| |
|
443 KB
| |
|
7713 KB
| |
|
7704 KB
| |
|
8890 KB
| |
|
10473 KB
|
